Himachal Pradesh’s Renukaji Dam project



  • On December 27, 2021, Prime Minister Narendra Modi will lay down the foundation of Renukaji Dam Project in Himachal Pradesh.
  • It is a Rs 6,700-crore project on the Giri river in Sirmaur district.
  • The project, once completed, is likely to generate 200 million units of energy in a surface power house which have the installed capacity of 40 MW.
  • Storage capacity of the dam will be 498 million cubic meters.
  • It will fulfil around 40 per cent of the drinking water requirement of Delhi.

Post a Comment

Previous Post Next Post

Featured Post

BPSC TRE 4.0 & 5.0 General Studies Chapterwise Solved Papers 2025

BPSC TRE 4.0 & 5.0 General Studies Chapterwise Solved Papers 2025 Purchase Book Online Click Here

Popular Posts